News
 

NPCC, Technip awarded contract for gas facilities in UAE

Posted: 30 July 2007
Send this article
Print this article

The National Petroleum Construction Company (NPCC), jointly with Technip, has been awarded by Abu Dhabi Marine Operating Company (ADMA-OPCO) an Engineering Procurement and Construction (EPC) contract for the Zakum Gas Processing Facilities in the offshore areas of Abu Dhabi .

The contract value is approximately AED1.4 Billion ($381.2 million). Technip will have a 35% share of this contrac

The project consists of installing gas processing and compression facilities to increase the production capacity of the Zakum field, while maintaining the reservoir pressure. The new gas compression platform will be connected to the existing lower Zakum Platform by a bridge. It will have two gas turbine driven centrifugal compression trains, a triethylene glycol dehydration unit, an air cooling unit and a vapor recovery system.

The facilities are scheduled to be operational in January 2010.

Technip will cover project management and engineering while procurement activities will be executed jointly with NPCC. All fabrication and offshore installation will be carried out by NPCC.

Fisher Severe Service

ePipeline Magazine

The full content of Pipeline Magazine – and more - is now available online.

You can access from anywhere. You can search the archives. Email an article to a colleague. Keep your own file of cuttings. more details

Pipeline Magazine is free to paying subscribers. Non-subscribers get a FREE TRIAL. Register here

Read the latest issue.
*Limited time only


powered by

Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com
 

 

Advertiser

Bayt.com


© Copyright 2006. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com