News
 

Petroceltic declares discovery in Isarene PSC

Posted: 25 December 2006
Send this article
Print this article

Petroceltic International plc, the Irish based international oil and gas exploration and production company with a portfolio of assets in Algeria , Ireland , Italy and Tunisia announced the following results of flow testing from the recently completed Hassi Tab Tab 2 (HTT 2) well and the earlier ISAS 1 well. Details of the test results are outlined below:

ISAS 1 (First exploration well that satisfied the PSC obligation)

A total of 1.210 million standard cubic feet per day (mmscf/d) of gas was tested from 2 geological horizons, the Devonian F2 and the Carboniferous Visean B. Both had sustained gas flows and stabilised wellhead pressures. However evaluation of the test data indicated formation damage at the Devonian F2 horizon, which severely reduced the flow rate during this test. In addition small amounts of gas were produced from an open hole test in the Ordovician.

Hassi Tab Tab 2 (Located 40 kms west of ISAS 1)

A total of 15.44 mmscf/d of gas was tested from 3 geological horizons, the Devonian F2, the Carboniferous Tournaisian and the Carboniferous Visean B. All had substantial flows and stabilized wellhead pressures. In accordance with the provisions of the PSC, a Declaration of Discovery for both wells has been submitted to Sonatrach. Petroceltic will provide updates regarding progress on this issue in due course.

John Craven, CEO of Petroceltic, commented:

"This is very significant news for Petroceltic and I am extremely pleased with the well test results. In particular the gas flow rate from the Devonian F2 in HTT 2 is one of the highest for this horizon in the Illizi Basin ."

"Furthermore, the well results have confirmed the potential for commercial exploitation of these shallow, laterally extensive, hydrocarbon reservoirs in this part of the Isarene Permit and we are currently reviewing all options with respect to the appraisal and development of the ISAS/Hassi Tab Tab area."

Fisher Severe Service

ePipeline Magazine

The full content of Pipeline Magazine – and more - is now available online.

You can access from anywhere. You can search the archives. Email an article to a colleague. Keep your own file of cuttings. more details

Pipeline Magazine is free to paying subscribers. Non-subscribers get a FREE TRIAL. Register here

Read the latest issue.
*Limited time only


powered by

Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com
 

 

Advertiser

 

© Copyright 2006. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com