News
 

Nabrajah-11 to be suspended for further testing

Posted: 28 August 2006
Send this article
Print this article

The testing of well Nabrajah-11 in Yemen is now completed and the well is being temporarily suspended. A maximum oil rate of 650 bopd was obtained during the test. Due to restricted inflow performance this oil rate was maintained only for a short period. The well is planned to be re-entered at a later stage for further stimulation and re-testing. Further stimulation and testing of Nabrajah 9 and Nabrajah 10 will be considered.

The rig will now be moved to the Tasour 23 location to drill a basement prospect in the Tasour area. Thereafter the rig will move back to Block 43 to drill an exploration well before returning to the Nabrajah Field for further drilling.

OilExec International Ltd

 

ePipeline Magazine

The full content of Pipeline Magazine – and more - is now available online.

You can access from anywhere. You can search the archives. Email an article to a colleague. Keep your own file of cuttings. more details

Pipeline Magazine is free to paying subscribers. Non-subscribers get a FREE TRIAL. Register here

Read the latest issue.
*Limited time only


powered by

Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com
 

 

Advertiser

 

© Copyright 2006. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com