News
 

Stratic positions first Tripod over Akkaya

Posted: 14 August 2006
Send this article
Print this article

To coincide with information released Tuesday by Toreador, operator of Stratic Energy Corp.'s gas development project in the South Akcakoca Sub-Basin of the Black Sea, cffshore Turkey, Stratic announces the following:

The operator has successfully positioned the first production tripod over the Akkaya field and will shortly commence pile-driving operations to secure the tripod at the sea bed. Two further tripods will be installed over the Dogu Ayazli and Ayazli fields over the next few months in the first phase of development in the project.

The operator has also released revised estimates for natural gas reserves in the proved, probable, possible and potential categories for the area contained within the boundaries of the existing 3D seismic survey, which includes those reserves currently under development within Phase I of the South Akcakoca Sub-Basin development referred to above. These estimates have been arrived at by Toreador's independent reserve engineers from nine successful wells and two dry holes drilled since September 2004 and from 2D and 3D seismic surveys conducted in the area.

Stratic's equity share of these estimates is 12.25%.

Kevin Watts, President & Chief Executive Officer, commented: "The successful positioning of the Akkaya tripod is an important milestone in the South Akcakoca Sub-Basin development, which continues on schedule. We note the operator's revised reserve estimates for the area, which are consistent with our internal estimates. We look forward to the forthcoming drilling program in the deeper water areas which is designed to add additional proven, probable and possible reserves for development through the Phase I infrastructure."

Stratic is an international exploration and development company with gas developments in Turkey, oil developments in the UK North Sea and exploration acreage in Morocco and Syria.

OilExec International Ltd

Crystal Ball

 

ePipeline Magazine

The full content of Pipeline Magazine – and more - is now available online.

You can access from anywhere. You can search the archives. Email an article to a colleague. Keep your own file of cuttings. more details

Pipeline Magazine is free to paying subscribers. Non-subscribers get a FREE TRIAL. Register here

Read the latest issue.
*Limited time only


powered by

Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com
 

 

Advertiser

 

© Copyright 2006. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com