NEWS ROOM  
 

:: Company News

 
     
  ARCHIVE  
  :: 2005  
  :: 2004  
  :: 2003  
     
     
     
     
     
     
     
     
     
     
 

NEWS

 
     
 

Gas re-injection plant in Abu Dhabi to be upgraded

Posted: 26 June 2006
Send this article
Print this article

GE's Oil & Gas business will upgrade gas turbines and compressors at the Asab Gas Development (AGD) gas re-injection plant in Abu Dhabi to increase the processing and production capabilities of the facility, which is owned by Abu Dhabi National Oil Company (ADNOC) and managed and operated by Abu Dhabi Gas Industries Ltd. (GASCO).

The upgraded AGD plant is being designed to produce 6,200 tons per day of natural gas liquids (NGL) from the Asab gas field. The EPC contractor for the project is Eastern Bechtel Co. Ltd. supported by VECO Engineering, the project management consultant.

The existing plant includes four GE MS5002C gas turbines that drive four BCL compressors for gas re-injection. Under the scope of GE's contract to expand the plant's capacity, the gas turbines will be upgraded to MS5002D models, which offer an increase in efficiency. The new machines also are equipped with new Dry Low NOx combustion systems that reduce NOx emissions across a broad operability range.

In addition, the four compressors will be equipped with newly designed internal parts, including a dry gas seals retrofit for the high-pressure compressors and new wheels for the gear boxes. The upgrade of the turbocompressor systems will improve flow capacity by approximately 14%.

To meet the new production requirements, an increase in pressure of five bars and a

new gas composition are required for the compressors. GE's compressor upgrade engineers, leveraging their experience based on more than 350 rebundling projects, have customized and redesigned compressor materials to fit the new conditions.

The upgrade project will be conducted during a 25-day plant shutdown scheduled in

October and November of 2007. GE will employ its new maintenance process, removing the gas turbines and replacing them in modules, which substantially reduces the length of the outage.

"We are pleased to be selected for this important plant upgrade, which will help to increase GASCO's gas development capacities," said Claudi Santiago, president of GE's Oil & Gas business. "The project is the latest example of our commitment to provide the latest technology to support the oil and gas industry in this critical region of the world."

GASCO is the operating company responsible for the processing of natural and associated gas in the Emirate of Abu Dhabi. Incorporated in 1978, GASCO was established as a joint venture among Abu Dhabi National Oil Company, Shell, Total and Partex.

ePipeline Magazine

The full content of Pipeline Magazine – and more - is now available online.

You can access from anywhere. You can search the archives. Email an article to a colleague. Keep your own file of cuttings. more details

Pipeline Magazine is free to paying subscribers. Non-subscribers get a FREE TRIAL. Register here

Read the latest issue.
*Limited time only


powered by

 



Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com

 
 


OilExec International Ltd

 
     


© Copyright 2006. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com