NEWS ROOM  
 

:: Company News

 
     
  ARCHIVE  
  :: 2005  
  :: 2004  
  :: 2003  
     
     
     
     
     
     
     
     
     
     
 

NEWS

 
     
 

Yemen ’s block S-1 fails to test hydrocarbons

Posted: 09 January 2006
Send this article
Print this article

TransGlobe Energy says Hatat 1 Well on block S-1 in the Republic of Yemen was plugged and abandoned after failing to test hydrocarbons from a 596 metre interval of Granitic Basement.

Hatat 1, which commenced drilling on 26 November 2005, reached a total depth of 1,614 metres. Although several fractures with hydrocarbon shows were encountered, the fractures were non-productive in the well bore.

The drilling rig is preparing to move to the next drilling location at An Nagyah 9.



Posted by Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com

 
     

 

© Copyright 2002. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 500643, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com